Thorpe Marsh Green Energy Hub, Doncaster

A nationally significant battery energy storage project being developed near Doncaster, South Yorkshire.

The Thorpe Marsh Green Energy Hub is a nationally significant battery energy storage project being developed by Fidra Energy on the site of the former Thorpe Marsh Power Station near Doncaster in South Yorkshire.

With a planned capacity of up to 1.45GW / 3.1GWh, the scheme is one of the largest battery energy storage facilities in the UK, capable of storing renewable energy and supplying electricity to support up to 800,000 homes. The project will strengthen grid resilience, support the transition to a low-carbon energy system, and deliver biodiversity enhancements across a prominent former industrial site.

FPCR provided an integrated package of landscape, environmental and design services to support the planning and delivery of the project, with the practice lead the Landscape and Visual Impact Assessment (LVIA), establishing the landscape and visual baseline, assessing the potential effects of the development, and identifying mitigation measures to minimise impacts on surrounding communities and receptors. Alongside this, FPCR developed the landscape design strategy, incorporating structural planting, habitat creation and visual screening to help integrate the energy infrastructure into its setting and contribute to the site’s long-term environmental enhancement.

In addition to Landscape Planning and Design, FPCR’s Ecology and Arboriculture teams provided specialist input to help inform the design process, support biodiversity objectives and ensure that environmental considerations were embedded throughout the development.

Collectively, FPCR’s multidisciplinary contribution helped transform a former power station site into a major piece of renewable energy infrastructure that balances energy security, landscape quality and environmental stewardship.